My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-13_PERMIT FILE - C1981041 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041
>
2002-05-13_PERMIT FILE - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:39 PM
Creation date
3/30/2009 12:18:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Doc Name
A-6 Geotechnical Investigation Pond 12
Section_Exhibit Name
Tab 13 Appendix 13-6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />U <br />PROJECT DESCRIPTION This report presents the results of our geotechnical evaluation <br />performed to determine the general subsurface conditions of the site applicable to re-constmction of the existing <br />embankment of the sedimentation pond, designated RSN Pond l2, Roadside North Portal, Cameo, CO. A <br />vicinity map is included in the Appendix of this report. <br />To assist in our exploration, we were provided with some cross sections of the pond embanlanent from <br />Powderhom Coal Company, dated 6-23-97. The Boring Location Plan attached to this report is based on that <br />plan provided to us. <br />We understand the proposed re-construction «1ll im~olve the existing dike of Pond 12 on the south side of the <br />pond, separating the pond from the c-: -.e Coal Creek Flow Channel In addition, the floor area of the pond <br />will require reworking. This projec~ :continuation of a Geotechnical Evaluation performed by Lincoln <br />DeVore, Inc., ]ob !t 86014-2164-J, 5-28-97. This previous report was concerned with the small dike on the east <br />• side of the pond which sepazated Pond 12 from Pond 5. <br />Thc existing earth and embanlanent, sepazating Pond 12 from the Coal Creek Drainage Channel is approximately <br />300 feet long and is approximately 5 to 7 Ccet high on [he north slope (Pond 12 side) and behvcen 22 to 25 fcet <br />high on the south side (Coal Creek Drainage Channel). This existing embanlonent and general slope <br />configuration has been in place for several years. The width of the embankment has been reduced over the years <br />and is planned to be reduced further due to a need for borow material and to increase the capacity of Pond 12. <br />At the base level of Pond 12, the embankment width is to be reduced from between 75 to 100 feet to <br />approximately 50 to 60 feet. The upper portion of the embankment, at the maximum water level of 4803 feet <br />is to be reduced from a range of 40 to 70 feet to 1 ~ to 25 Ceet wide. At the final embankment elevation, allowing <br />for 1 foot of free board (4804 feet), the embankment width should be approximately 12 to 18 feet wide. <br />If the proposed site use or type of construction proposed is changed, Lincoln DeVore should be contacted to <br />deternine if the information in this report can be used for the new constmction without further evaluation being <br />required. <br />• PROJECT SCOPE The purpose of our exploration was to evaluate the surface and <br />
The URL can be used to link to this page
Your browser does not support the video tag.