My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-23_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-03-23_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:41 PM
Creation date
3/30/2009 10:16:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
3/23/2009
Doc Name
Adequacy Review Memo
From
Marcia Talvitie
To
Jim Stark
Type & Sequence
TR76
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />INTEROFFICE MEMORANDUM <br />4 <br />Date: 23 March 2009 <br />To: Jim Stark <br />From: Marcia Talvitie <br />Subject: Colowyo Mine - Permit No. C-1981-019 <br />Technical Revision No. 76 (TR-76) - South Taylor Haul Road <br />Adequacy Review - Engineering <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />At your request, I have reviewed the application for TR-76, submitted by Rio Tinto for <br />the Colowyo Mine, with respect to the requirements of Section 4.03.1 - Haul Roads. The <br />"Change Sheet" accompanying the application lists the following items that were <br />included with TR-76: <br />• Volume 1 Rule 4.03-1 through 4.03-3 (3 pp) Updated Text <br />• Volume 8 Map 23 (updated) and Map 25C (new) <br />• Volume 12 Rule 4, Pages 2 thru 5 . Updated Text <br />Rule 4.03.1(1) - General Requirements <br />1. Section 4.03.1(1)(f) requires that all haul roads be removed and the affected land <br />reclaimed in accordance with the requirements of 4.03.1(7). The TR-76 <br />application does not address proposed reclamation of the South Taylor Haul <br />Road. Please provide the Division with reclamation details for the proposed <br />Haul Road. <br />Rule 4.03.1(3) - Design and Construction <br />2. Construction Note 13 on Map 25C states that, "Temporary erosion control <br />measures shall be implemented during construction to minimize sedimentation <br />and erosion until permanent control measures can be established." Please <br />describe the temporary and permanent erosion control measures that will be <br />implemented during construction, in accordance with Rule 4.03.1(3)(d)(ii). <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.