Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br /> The following identifies enforcement actions taken during this inspection, the required abatement and <br /> date of abatement for the violation, previous violations still requiring abatement and the termination of <br /> violations cited during previous inspections. <br /> NOV CV-2009-001 was issued on February 27, 2009 for failure to minimize erosion and resultant <br /> siltation beyond the disturbed area. The area of concern was at the entrance to the Bowie No. 1 East <br /> Mine. The abatement work for the NOV was to install and maintain effective erosion and sediment <br /> control measures to minimize siltation beyond the disturbed area. The abatement deadline for this <br /> work was March 5, 2009. A design drawing and digital images of the completed work had been e- <br /> mailed to the Division on March 5, 2009. This field inspection verified that the work had been <br /> completed. NOV CV-2009-001 was, therefore, terminated on March 17, 2009. <br /> NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br /> Revised 2197 <br />