My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981038 (41)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981038
>
_INSPECTION - C1981038 (41)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2020 3:47:28 PM
Creation date
3/27/2009 10:06:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
3/17/2009
Email Name
JJD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during the <br /> inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br /> evidence supporting the enforcement action. <br /> The purpose of this inspection was to examine the abatement work that had been done for NOV CV-2009-001 <br /> and terminate the NOV if appropriate.The NOV was issued for failure to minimize erosion and resultant <br /> siltation beyond the disturbed area.The operator had removed the asphalt from the haul road past the entrance <br /> gate as part of the reclamation of the Bowie No. 1 East Mine but did not properly install sediment control <br /> structures at the entrance to the site off of Steven's Gulch road. Due to a precipitation event,runoff from the dirt <br /> haul road had transported sediment offsite. The abatement work for the NOV was to install and maintain <br /> effective erosion and sediment control measures to minimize siltation beyond the disturbed area. <br /> As abatement for the NOV,the operator installed a series of straw bales in the north side road ditch to filter <br /> sediment out of any runoff before it leaves the site. The straw bales were spiked into the ground to secure them <br /> in place.In addition,a swale was constructed diagonally across the road from south to north to channel runoff <br /> from the dirt road into the north side road ditch.A second swale was constructed diagonally across the road <br /> from north to south to bring road runoff into a containment area located by the entrance gate.A row of straw <br /> bales was placed in front of the containment area to filter runoff before leaving the site. <br /> The abatement deadline for this work was March 5, 2009.A design drawing and digital images of the completed <br /> work had been e-mailed to the Division on March 5, 2009. This field inspection was to verify that the work had <br /> been completed.NOV CV-2009-001 was,therefore,terminated on March 17, 2009. <br /> c:/word/bowie 1/insp03 09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.