Laserfiche WebLink
Miscellaneous <br />10. The third paragraph of Page 4.03-1 has been modified to incorporate South Taylor <br />Haul Road information. However, the remainder of the page continues to refer to <br />"both" Haul Roads (presumably A and B). Please modify the remainder of Page <br />4.03-1 to ensure clarity and consistency with the fact that there will now be three <br />permitted haul roads. <br />11. The last sentence of the third paragraph on Page 4.03-1 refers to Permit Volume <br />Fourteen, but the "Change Sheet" which accompanied the application indicates that it <br />is pages in Volume 12 that have been modified. The text portion of the South Taylor <br />expansion is contained in permit Volume 12. Please correct this discrepancy. <br />12. The fourth paragraph on page 4.03-1 states that the "haul roads" have been paved <br />with asphalt... According to the Construction Notes on Map 25C, the South Taylor <br />Haul Road will be surfaced with rock or crushed gravel. Please revise the text on <br />page 4.03-1 to clarify the type of surfacing for each of the three haul roads. <br />13. Although unrelated to the South Taylor Haul Road designs per se, on the third line of <br />the fourth paragraph on page 4.03-1 there is an extraneous period (".") between the <br />phrase "located in" and the word "the". Please remove this period. <br />This completes the preliminary adequacy review for Technical Revision 76. The Division's <br />proposed decision date for this revision is 24 April 2009. Colowyo's prompt response to this <br />letter will help ensure that this date is met. Please contact me at (303) 866-3567 X8145 if you <br />have any questions. <br />Sincerely, <br />James R. Stark <br />Environmental Protection Specialist <br />cc: Sandy Brown