My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-24_INSPECTION - M1987166
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1987166
>
2009-03-24_INSPECTION - M1987166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:43 PM
Creation date
3/25/2009 11:15:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987166
IBM Index Class Name
INSPECTION
Doc Date
3/24/2009
Doc Name
Insp Rpt
From
DRMS
To
Westhoff Farms
Inspection Date
2/26/2009
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-19A7-166 <br />INSPECTION DATE: 9/9i./n9 INSPECTOR=S INITIALS: MAC' <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1.,/ The permit boundary has been incorrectly delineated. <br />The Operator shall reestablish the permit boundary through a survey or other means so that it <br />reflects the approved permit acreage. The Operator shall also provide the Division with a <br />legal description of the site as well as map that clearly shows the permit boundary. The map <br />and legal description must be submitted to the Division on or before April 24, 2009. <br />2. IThe mining operation is within 200 feet of a power transmission line. <br />The Operator shall provide the Division with a notarized damage waiver agreement with the <br />utility or a notarized letter from the utility stating that the mining operation will not have a <br />negative impact on the power transmission line. The above requested documentation must <br />be provided to the Division on or before April 30, 2009 <br />CORRECTION <br />DATE <br />4 / 24 /09 <br />PB or PV: PR <br />TOPIC(S): SM <br />4 / 30 / 09 <br />PB or PV: _P_B_ <br />TOPIC(S): AR
The URL can be used to link to this page
Your browser does not support the video tag.