My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-24_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2009-03-24_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:43 PM
Creation date
3/25/2009 11:00:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
3/24/2009
Doc Name
Reclamation Cost Estimate
From
Susan Burgmaier
To
Dan Mathews
Type & Sequence
SL3
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 30a <br />Date : 0311712009 <br />User: SLB <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase 11 Bond Release Request <br />Task description :Finish grade landfill area <br />HOURLY EQUIPMENT COST <br />Basic machine: CAT 14H Horsepower : 215 <br />Attachment no. 1 : NA Shift basis : 1 per day <br />Attachment no. 2 : Multi-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown Ownership cost/hour : $43.20 NA <br />Grader operating cost/hour : $48.51 100 <br />Ripper operating cost/hour : $0.00 0 <br />Operator cost/hour : $24.47 NA <br />Total unit cost/hour : $116.18 Total fleet cost/hour : $116.18 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 3.00 acres <br />Source of estimated acreage :Exhibit 13-2 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees " • at 0 degrees, blade is perpendicular <br />Effective blade length : 12.10 feet to direction of travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet'" •? width of ripper beam o n ripping applications <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 7,200 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.75 (user) <br /> Net job correction : 0.7500 multiplier <br /> <br />Adjusted hourly unit production : 1.1477 acres/hour <br />Adjusted hourly fleet production : 1.1477 acres/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time 2.61 hours <br />Unit cost : $101.23 per acre Total job cost : $304 <br /> <br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />State : Colorado <br />County :Routt <br />Site : Seneca li Mine <br />Permit/job #: C-1980-005 <br />Abbreviation :none <br />Filename :0005-30a
The URL can be used to link to this page
Your browser does not support the video tag.