My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-24_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2009-03-24_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:43 PM
Creation date
3/25/2009 11:00:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
3/24/2009
Doc Name
Reclamation Cost Estimate
From
Susan Burgmaier
To
Dan Mathews
Type & Sequence
SL3
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 030 <br />Date : 0311712009 <br />User: SLB <br />Permit/job# : C-1981-005 <br />Abbreviation : none <br />Filename :0005-030 <br />Agency or organization name : CDRMS <br />Permit or other job action :Phase // Bond Release Request <br />Task description :Regrade landfill area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.38 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $5.02 50 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $273.67 Total fleet cost/hour : $273.67 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 86,475 CCY factor : 1.165 volume : 100,743 LCY <br /> <br />Source of estimated volume: Exhibit 13-2 <br />Source of estimated swell factor : Division estimate <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 754.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.70 (fnd-mf) <br /> Push gradient : 1.33 (Cat HB) <br />Average push gradient: 15.00 % (neg) Altitude : 1.00 (Cat HB) <br />- <br />Average site altitude : 7,200 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2900 Ibs/LCY Net correction : 0.41 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 1 <br />Unit cost : $0.878 <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County : Routt <br />Site : Seneca li Mine <br />Adjusted unit production : 311.70 <br />Adjusted fleet production : 311.70 <br />_LCY/hr <br />LCY/hr <br />Dozer(s) Total job time : 323.20 Hours <br />/LCY Total job cost : $88,451
The URL can be used to link to this page
Your browser does not support the video tag.