Laserfiche WebLink
3. List any additional changes to the original prospecting and reclamation plan or <br />any unexpected problems (such as unexpected water or artesian conditions <br />encountered). (Attach additional pages, if needed.) <br />More core holes were drilled than originally planned. This was a <br />result of a defective bearing in the core barrel that resulted <br />4. When do you expect to complete all exploration and reclamation activities for <br />this project? <br />All explanation and reclamation activities were completed <br />on 2/19/09. <br />5. Does the prospector wish this report to be considered confidential? See Rule <br />2.02.7(2). No If yes, attach a justification for the request. <br />6. Additional Comments: <br />Date: 3/13/09 <br />ignature Authorized Representative <br />Western Fuels-Colorado. LLC <br />(11/01) <br />Company