My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-23_PERMIT FILE - X200814213 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200814213
>
2009-03-23_PERMIT FILE - X200814213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:41 PM
Creation date
3/24/2009 10:25:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200814213
IBM Index Class Name
PERMIT FILE
Doc Date
3/23/2009
Doc Name
180 Day Report
From
Western Fuels
To
DRMS
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a?'?? cOlo <br />"ems$ COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />.7876 « 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />RECEIVED <br />MAR 2 3 gnnq <br />Division or rug ,;cmation, <br />COAL EXPLORATION 180-DAY RE *1 and Safety <br />Prospector: Western Fuels-Colorado,LLC Notice of Intent No.: X-2008-142-13 <br />Address: P•0. Box 33424 Project Name: New Horizon North Adjacent/Cy rus <br />lock <br />Denver, CO 80233 County: <br />Montrose <br />Date: 3/13/09 <br />This report is filed in accordance with Rule 2.02.6(3)(a) of the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining, adopted in accordance with the Colorado <br />Surface Coal Mining Act, C.R.S. 34-33-101 et seq. The purpose of this report is to update <br />the Division on exploration and reclamation activities that have occurred in the past 180 days <br />of active prospecting. The report also indicates any changes in operations from what was <br />stated in the original Notice of Intent sent to the Division. The Operator may use this form, <br />modify this form, or use a different format altogether. <br />1. Attach a map that shows: <br />a) Which proposed holes have been drilled at the date, <br />b) Any actual or proposed relocations of holes, <br />c) The extent of all significant road construction completed to date (exclude <br />minor blade work), and <br />d) Current location of all drill rigs and test equipment. <br />2. Describe what and where reclamation activities have occurred in the past 180 <br />days. Mention sealing and plugging, regrading, retopsoiling and reseeding <br />activities. (Attach additional pages, if needed.) <br />See Attached
The URL can be used to link to this page
Your browser does not support the video tag.