My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-12_REVISION - M1977210
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977210
>
2009-02-12_REVISION - M1977210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:44 PM
Creation date
3/23/2009 2:55:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
REVISION
Doc Date
2/12/2009
Doc Name
Submittal
From
Continental Materials Corporation
To
DRMS
Type & Sequence
TR3
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE 1 AMENDMENT IS NOW CONSIDERED RECLAIMED, <br />BUT HAS NOT FORMALLY BEEN RELEASED. <br />1994 COST WAS $1,360.00 <br />SUGGEST THAT AMOUNT BE CARRIED OVER TO 2009 RECALCULATION <br />TOTAL PHASE 1 COST $1,360.00 <br />Area WP: <br />current status: <br />1. essentially all backfilling has been completed. <br />(will include costs for an additional 10 feet for good measure.) <br />2. other than that, it is much like it was in 1994. <br />Existing Pit area: <br />surface area <br />additional backfill depth <br />volume of fill needed <br />volume of fill needed <br />cost/yd <br />(just a lateral push from adjacent material) <br />Backfilling cost <br />6.5 acres <br />25 feet <br />7078500 cu ft <br />262,167 cu yds <br />$0.40 per cu yd <br />$104,866.67 1994 amt = $175,450.00 <br />All Area WP revegetation (includes existing pit area + rest of pit floor + storage pond area) <br />Total area requiring revegetation 28 <br />Topsoil depth 0.5 feet <br />Topsoiling cost $0.50 per cu yd <br />(an easy process on level ground) <br />Topsoil volume needed 609840 cu ft <br />Topsoil volume needed 22,587 cu yds <br />Cost for topsoiling $11,293.33 1994 amt = $7,018.00 <br />Cost of seed per acre $85.77 <br />Cost of seed for total area $2,401.50 for 26.9 acres <br />Cost of drilling $90.00 per acre <br />Total cost for drill seeding $2,520.00 for 26.9 acres <br />Total cost for revegetation $4,921.50 1994 amt = $1,517.06 <br />TOTAL AREA WP RECLAMATION COSTS = $121,081.50 <br />1994 amt = $183,985.06 <br />TOTAL RECLAMATION COSTS FOR EXISTING DISTURBANCE AS OF JANUARY 2009: <br />West Ridge $34,733.51 <br />Area WP $121,081.50 <br />TOTAL $155,815.01 <br />NOTE: The 1994 costs were $273,721.10, but that included $5,193.11 for North Wall. <br />The North Wall is accounted for below in expanded mining reclamation costs. <br />For comparison, the equivalent area 1994 reclamation cost was $268,527.99. <br />The decline in these costs is accounted for in all of the existing pit backfilling <br />that has occurred since 1994.
The URL can be used to link to this page
Your browser does not support the video tag.