My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-12_REVISION - M1977210
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977210
>
2009-02-12_REVISION - M1977210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:44 PM
Creation date
3/23/2009 2:55:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
REVISION
Doc Date
2/12/2009
Doc Name
Submittal
From
Continental Materials Corporation
To
DRMS
Type & Sequence
TR3
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond Cost Recalculation - January 2009 <br />(original bond calculations done in May 1994) <br />Basic Site Plan Characteristics: <br />Permit area <br />Total Permit Affected Land <br />Total Current Affected Land <br />Land Area Already Reclaimed <br />Remaining land to be reclaimed <br />(of currently affected land) <br />110 acres <br />68 acres <br />37.5 acres <br />4.9 acres <br />32.6 acres <br />West Ridge: <br />current status: <br />1. The underground workings have been blasted. <br />2. It is unlikely this area will be mined. <br />3. The area is now stable, but needs some growth medium. <br />4. The 1994 calculations are updated below. <br />Total Area 5.7 acres <br />Ave. backfill x-sec area = 450 sq ft <br />Length of backfill area = 900 feet <br />Volume of backfill area = 405000 cu ft <br />Volume of backfill area = 15000 cu yds <br />Cost per yard = $1.25 <br />Backfill cost = $18,750.00 1994 amt = $9,000 <br />Ave. topsoil depth = 0.5 feet <br />Volume of topsoil needed = 124146 cu ft for 5.7 acres <br />Volume of topsoil needed = 4598 cu yds for 5.7 acres <br />Cost per yard = $1.25 <br />Cost for topsoiling = $5,747.50 1994 amt = $4,598.00 <br />Estimated Cost of seed <br />Acres <br />Total cost of seed <br />Cost per acre for broadcast <br />Total seeding cost <br />Total revegetation cost = <br />$130.79 per acre <br />5.7 <br />$745.51 for 5.7 acres <br />$65.00 <br />$370.50 for 5.7 acres <br />$1,116.01 1994 amt = $845.38 <br />Final base tree density 25 trees per acre <br />Trees to plant @ 25% survival 100 per acre <br />Cost per tree $8.50 tree + planting <br />Total tree costs $4,845.00 1994 amt = $2,280.00 <br />Shrub seeding costs are unknown, <br />but probably in the range of $750/acre for seed. <br />seeding could be done with grass seeding. <br />Estimated cost $4,275.00 1994 estimated amt = $171.00 <br />TOTAL WEST RIDGE RECLAMATION COST <br />1994 COST WAS $16,894.38 <br />$34,733.51 <br />cost per acre 2009= $6,093.60
The URL can be used to link to this page
Your browser does not support the video tag.