Laserfiche WebLink
J&T Consulting, Inc. Journey Ventures, LL <br />Kersey Gravel Pit <br />3/18/2009 <br />Reclamation Bond Quantities and Costs tpy/jcy <br />© 2009 1&T ICOp9U]t111Q. Inc, 07113 Journey Ventures Pit Rec Bond Calcs <br />Phase 9 (3.60 acres) <br />Leclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Credit for Slurry Wall Required to Close Phases 3-8 (7,640) If $ 310.00 $ (2,368,400) <br />Slurry Wall Required to Close Phases 3-9 7,528 If $ 310.00 $ 2,333,680 <br />Credit for Overburden Placement Required to Close Phase 3-8 (226,370) cy $ 2.25 $ (509,333) <br />Overburden Placement Required to Close Phase 3-9 223,052 cy $ 2.25 $ 501,867 <br />Scarifying Disturbed Area Phase 9 0.05 ac $ 200 $ 10 <br />Topsoil Placement Disturbed Area Phase 9 0.05 ac $ 1,800 $ 90 <br />Revegetate Disturbed Area Phase 9 0.05 ac $ 1,000 $ 50 <br />Dewatering Req'd for Phase 9 Area 245.72 Mil. Gal. $ 400.00 $ 98,288 <br /> Total Di rect Cost $ 56,251 <br />Overhead and Profit Cost (12.60%) $ 7,088 <br />Contract Cost $ 63,339 <br />Project Management (9.25%) $ 5,859 <br />Phase 10 (5.85 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Active Mining Area <br />Credit for Slurry Wall Required to Close Phases 3-9 (7,528) If $ 310.00 $ (2,333,680) <br />Slurry Walt Required to Close Phases 3-10 7,501 If $ 310.00 $ 2,325,310 <br />Credit for Overburden Placement Required to Close Phase 3-9 (223,052) cy $ 2.25 $ (501,867) <br />Overburden Placement Required to Close Phase 3-10 222,252 cy $ 2.25 $ 500,067 <br />Scarifying Disturbed Area Phase 10 0.52 ac $ 200 $ 104 <br />Topsoil Placement Disturbed Area Phase 10 0.52 ac $ 1,800 $ 936 <br />Revegetate Disturbed Area Phase 10 0.52 ac $ 1,000 $ 520 <br />Dewatering Req'd for Phase 10 Area 42.85 Mil. Gal. $ 400.00 $ 17,140 <br /> Total Di rect Cost $ 8,530 <br />Overhead and Profit Cost (12.60%) $ 1,075 <br />Contract Cost $ 9,605 <br />Project Management (9.25%) $ 888 <br />Additional Financial Warrant Required For Phase10 $ 10,493 <br />Cummulative Financial Warrant Required For Phases 1-10 $ 3,996,742 <br />5of6