My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-19_PERMIT FILE - M2008080 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008080
>
2009-03-19_PERMIT FILE - M2008080 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:34 PM
Creation date
3/23/2009 2:44:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
PERMIT FILE
Doc Date
3/19/2009
Doc Name
Adequacy Review Response- 02
From
J&T Consulting, Inc.
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. Journey Ventures, LL <br />Kersey Gravel Pit <br />3/18/2009 <br />Reclamation Bond Quantities and Costs tpy/icy <br />© 2009 J&T Consnltlm Ina 07113 Journey Ventures Pit Rec Bond Calcs <br />Phase 1 (3.61 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Scarifying Topsoil/OB Stockpile Areas in Phase 11 0.32 ac $ 200 $ 64 <br />Topsoil Placement Topsoil/OB Stockpile Areas in Phase 11 0.32 ac $ 1,800 $ 576 <br />Revegetate Topsoil/013 Stockpile Areas in Phase 11 0.32 ac $ 1,000 $ 320 <br />Scarifying Disturbed Area Phase 1 3.61 ac $ 200 $ 722 <br />Topsoil Placement Disturbed Area Phase 1 3.61 ac $ 1,800 $ 6,498 <br />Revegetate Disturbed Area Phase 1 3.61 ac $ 1,000 $ 3,610 <br />Mobilization 1.0 Is $ 2,500 $ 2,500 <br />Total Direct Cost $ 14,290 <br />Overhead and Profit Cost (12.60%) $ 1,801 <br />Contract Cost $ 16,091 <br />Project Management (9.25%) $ 1,488 <br />Total Required Financial Warrant For Phase 1 $ 17,579 <br />Phase 2 (7.38 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Scarifying Disturbed Area Phase 2 7.38 ac $ 200 $ 1,476 <br />Topsoil Placement Disturbed Area Phase 2 5.20 ac $ 1,800 $ 9,360 <br />Revegetate Disturbed Area Phase 2 5.20 ac $ 1,000 $ 5,200 <br />Mobilization 1.0 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 18,536 <br />Overhead and Profit Cost (12.60%) $ 2,336 <br />Contract Cost $ 20,872 <br />Project Management (9.25%) $ 1,931 <br />Additional Financial Warrant Required For Phase 2 $ 22,802 <br />Cummulative Financial Warranty Required For Phase 1-2 $ 40,381 <br />Phase 2A (1.27 acres) <br />Reclamation Operation Quantity Unit Unit Cost Cost <br />Scarifying Disturbed Area Phase 2 1.27 ac $ 200 $ 254 <br />Topsoil Placement Disturbed Area Phase 2 0.90 ac $ 1,800 $ 1,620 <br />Revegetate Disturbed Area Phase 2 0.90 ac $ 1,000 $ 900 <br />Mobilization 1.0 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 5,274 <br />Overhead and Profit Cost (12.60%) $ 665 <br />Contract Cost $ 5,939 <br />Project Management (9.25%) $ 549 <br />Additional Financial Warrant Required For Phase 2A $ 6,488 <br />Cummulative Financial Warrant Required For Phase 1-2A $ 46,869 <br />2of6
The URL can be used to link to this page
Your browser does not support the video tag.