My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-19_PERMIT FILE - M2008080 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008080
>
2009-03-19_PERMIT FILE - M2008080 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:34 PM
Creation date
3/23/2009 2:44:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
PERMIT FILE
Doc Date
3/19/2009
Doc Name
Adequacy Review Response- 02
From
J&T Consulting, Inc.
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. <br />Reclamation Bond Quantities and Costs <br />Summary of Unit Costs <br />Direct costs <br />Re-applying topsoil 12" thick <br />Revegetating disturbed area <br />Dewatering full pit <br />Slurry Wall Cost (75 foot average depth) <br />(0-50 R @ $31ft - 51-70 ft @ $41ft - 71-75 ft @ $161ft) <br />Scarifying Ground <br />Mobilization <br />Journey Ventures, <br />Kersey Gravel <br />3/18/2( <br />07113 Journey Ventures Pit Rec Bond <br />$1,800.00 / acre <br />$1,000.00 /acre <br />$400.00 / million gallons <br />$310.00 / linear foot <br />$200 / acre <br />$2,500 lump sum <br />Overburden Placement <br />Hauling and placement of overburden $0.50 / cubic yard <br />Blending and moisture conditioning $0.50 / cubic yard <br />Compaction to desired density $1.00 / cubic yard <br />QA/QC $0.25 / cubic yard <br />Total Overburden Placement Cost $2.25 / cubic yard <br />Overhead and Profit Costs <br />Liability insurance <br />Performance bond <br />Profit <br />Project Management <br />Engineering and bidding <br />Management and administration <br />1.55% of direct cost <br />1.05% of direct cost <br />10.00% of direct cost <br />Total Overhead Cost 12.60% of direct cost <br />4.25% of direct cost <br />5.00% of direct cost <br />Total Additional Cost 9.25% of direct cost <br />1 of 6
The URL can be used to link to this page
Your browser does not support the video tag.