Laserfiche WebLink
*Note: All unit costs are based on the Divisions Holton Lakes (M-2007-008) reclamation <br />cost work sheet. <br />2. Indirect Cost: <br />Indirect Cost Item Cost Factor Total Cost <br />Contractor Profit 10% of Direct Cost $12,500.00 <br />DRM&S Admin. Expense 5% of Direct Cost $6,250.00 <br />Liability Insurance 2% of Direct Cost $2,500.00 <br />Performance Bond 1% of Direct Cost $1,250.00 <br />Total Indirect Cost $22,500.00 <br />3 Total Reclamation Cost and Financial Warranty Estimate $147,536.00