Laserfiche WebLink
Reclamation Cost Estimate <br />As stated above, the reclamation cost estimate for Morton Lakes is based on limited <br />(initial) pit development. <br />1. Estimated Direct Reclamation Cost: <br />A. Backfill, Grading and Shaping Cost Estimate <br />Mining Stage Slope Backfill Topsoil Unit Cost* Total Cost <br />1 57,500 yds 27,500 yds $ 0.75/LCY $63,750.00 <br />2 <br />3 32,300 yds $ 0.75/LCY $24,225.00 <br />4 <br />5 <br />Slurry Wall Caps 5,700 yds $ 0.75/LCY $4,275.00 <br />Total Cost $92,225.00 <br />B. Revegetation Cost Estimate <br />Revegetation Activity for 53 Acres Unit Cost* Total Cost <br />Scarify Soil $30.00/Acre $1,590.00 <br />Grass Seed Mix $40.00/Acre $2,120.00 <br />Drill Grass Seed $18.00/Acre $954.00 <br />Weed Control $15.00/Acre $795.00 <br />Total Cost $5,459.00 <br />C. Demo and Salvage <br />Activity Unit Cost* Total Cost <br />Seal 8 Monitoring Wells $294.00/Well $2,352.00 <br />Demo and Salvage Estimate $25,000.00 <br />Total Cost $27,352.00 <br />Total Direct Reclamation Cost (A, B and C above) $125,036.00 <br />2