r+ <br />MINED LAND RECLAMATION BOARD 110(2) ANNUAL REPORT <br />For Season 2008 <br />CRYSTALJACK MINING <br />PERMIT NO. M-1993-030 <br />Prepared: 13 March 2009 <br />Summary: <br />We operated mechanized equipment on Crystaljack mining properties from 15 May <br />through 30 May in recovery of smoky quartz, fluorite, goethite, and other crystallized <br />minerals. During this time, the equipment was idle 2 days for maintenance and on <br />Sundays. The access road was constructed into the Free Hawk and a gate was installed. <br />Work began on the C & J No. 1 where one prospect was opened and reclaimed. A second <br />prospect was opened and reclaimed on the Free Hawk. Most work consisted of <br />continuing the excavation at Site 7 on the Two Point. All sites on Crystaljack which were <br />opened, were closed, recontoured and reseeded. <br />Map Depicting Operations: <br />Attached are maps showing the ten claims covered under this permit, permit M-1993- <br />030. The maps show past excavations which have been reclaimed (green), currently open <br />dig sites (shaded orange) and proposed dig sites (either a blue button or a rectangle). <br />Current Disturbances (2008): <br />A primitive road for walking in equipment was constructed for access to the Free Hawk <br />and gated. Prospect 25 was opened for approximately 1,200 square feet ( 0.03 acre) on <br />the Free Hawk, and prospect 23 was opened for approximately 2,000 square feet (0.05) <br />acre on the C & J No. 1. Neither prospect showed economic mineralization and both were <br />closed, recontoured, and reseeded. Site 7 on the Two Point was opened an additional <br />6,000 square feet (0.13 acre) then closed, recontoured and reseeded. This site will be <br />finished during 2009. No sites are currently open on Crystaljack properties except a <br />prospect, Site 5 (Site E) on Qui-Buc No. 1. <br />Reclamation Summarv (Includes 2008 Reclamation): <br />Since this project began in 1993, approximately 4.37 acres have been excavated and <br />reclaimed. All newly reclaimed sites have been reseeded the same season. These sites are <br />then planted with trees the following season. Only Site 5 (Site E) on Qui-Buc No. 1 and <br />Sites 7 and 5 on the Two Point Mine are less than 80 percent growth.