Laserfiche WebLink
M-2008-078 - GP Ranches, LLC - West Farm Pit - 112 (c) Application Adequacy Review 01 Response <br />March 17, 2009 <br />-4- <br /> <br />Phase Average Mining <br />Depth ft <br />13 64 <br />14 57 <br />15 48 <br />16 49 <br />17 46 <br />18 57 <br />11. The Mining Plan indicates that mining will progress down to the bedrock, which will be used in <br />the construction of the liner. Please specify the depth to which the bedrock will be mined. <br />The depth to which portions of the bedrock will be mined will be 3 feet. <br />12. An unaccounted for overhead electric line was identified during the pre-operation inspection of the <br />site. The electric line runs from north to south through the two reservoir cells. Please explain what <br />will happen to this electric line when this area of the site is mined. Also, include the overhead <br />electric line on the Mining Plan Map and the Reclamation Plan Map if necessary. <br />The overhead electric line will be relocated prior to mining that area. A draft structure and <br />relocation agreement with the owner (Lamar Light and Power) of the line is attached that grants <br />GP permission to relocate the line. GP will maintain a minimum mining setback of 200 feet from <br />the powerline to be relocated until the relocation agreement has been finalized. An updated <br />Exhibit C Pre-Mining/Mining Plan Map is attached that includes the location of the overhead <br />electric line. <br />6.4.5 Exhibit E - Reclamation Plan <br />13. The Reclamation Plan states that when reclamation is complete, the site will contain a reservoir <br />with two interconnected cells. Please clarify how the cells of the reservoir will be interconnected. <br />The reservoir cells will not be interconnected. They will be reclaimed as separate cells. <br />14. The applicant indicates that the topsoil stockpiles will be seeded if they sit longer than one growing <br />season. Please specify the seed mix to be used on the topsoil stockpiles per Rule 6.4.509 (ii). <br />The stockpiles will be seeded with the seed mix identified in the Exhibit E Reclamation Plan that <br />was recommended for use on this site by the Prowers County NRCS. <br />15. The Reclamation Plan calls for replacing the topsoil to a depth of six inches. The Division <br />recommends replacing the topsoil to a depth of twelve inches. The affected area will be primarily <br />surface water when reclamation is complete. This will provide the operator with a sufficient <br />amount of topsoil, so as to replace it to a depth of twelve inches. Please commit replacing twelve <br />inches of topsoil. <br />GP commits to replacing the topsoil to a depth of twelve inches. <br />V 1400 W 122nd Avenue -Suite 120 • Westminster CO 80234 • Ph: 303-457-0735 • Fax: 303-920-0343