Laserfiche WebLink
AN EXAMPLE PUBLIC NOTICE WHICH MEETS THE REQUIREMENTS OF THE STATUTES IS SHOWN BELOW. <br />THE BLANKS WHICH REQUIRE DATES WILL NEED TO BE FILLED IN ACCORDING TO THE FOLLOWING <br />INSTRUCTIONS. PLEASE READ CAREFULLY. <br />PUBLICATION INSTRUCTIONS; <br />Date of commencement and date of completion should represent the dates which you feel most accurately describe the life of the <br />operation. <br />For all Regular (112) types of operations, this notice must be published once a week for four (4) consecutive weeks, starting <br />within ten (10) days of the date the application is considered to be submitted to the Division. The final date for receiving <br />comments is the 20th day after the fourth publication or the next regular business day. <br />All notices must be published in a newspaper of general circulation in the locality of the proposed mining operation and mailed <br />to the landowners as set forth in the Colorado Mined Land Reclamation Rules and Regulations. Since the date for consideration <br />of your application may change, DO NOT include it in this notice. <br />For a complete discussion of the notice procedures and objections, please refer to C.R.S. 34-32.5-112(10), 114 and 115. <br /> <br />PUBLIC NOTICE <br />s/<C.n-cA4, 41 S6 G, a?( <br />(Operator Name) 4?c a e r' 1 l? ; (Address and Phone Number) a.)y19 2?,? L7 ??©6/6G0 (?Prfrx- Co <br />has filed an application for a Regular (112) Construction Materials Operation Reclamation Permit with the Colorado Mined 1,61 Land Reclamation Board under provisions of the Colorado Land Reclamation Act for the Extraction of Construction Materials. <br />The proposed mine is known as the (Name of the Mine) _ Auj /''lams, P t7- , and is located at or <br />near Section 2 _, Township 3 3 , Range /2s, / ° Prime Meridian. <br />The proposed date of commencement is 8 / - ---, y 0 5 , and the proposed date of completion <br />is The proposed future use of the land is (Future I.anduse) /0-I a/NON. Additional <br />information and tentative decision date may be obtained from the Division of Reclamation, Mining, and Safety, 1313 Sherman <br />Street, Room 215, Denver, Colorado 80203, (303) 866-3567, or at the (County Name) /4 i°Wt t S County Clerk and <br />Recorder's office; (Clerk and Recorder's Address) 1060 e -1 le&e- ?µ-F r the above-named applicant. <br />Comments must be in writing and must be received by the Division of Reclamation, Mining, and Safety by 4:00 p.m. on (Final <br />Date for Comments) <br />Please note that under the provisions of C.R.S. 34-32.5-101 et M. Comments related to noise, truck trajfc, hours ofoperation, <br />visual impacts, effects on property values and other social or economic concerns are issues not subject to this Office's <br />-jurisdiction. These subjects, and similar ones, are typically addressed by your local governments, rather than the Division oJ' <br />Reclamation, Mining, and Sall ty or the Mined Land Reclamation Board, <br />M ?min,slgrB'.vsftttm)s\O'-07-01 vsfiormK;oiwtnuwtion 112A)c 0712412007)