Laserfiche WebLink
<br />Page 2 of 2 <br />operation <br />to strip out the VOC's . We will sample every two days for 6 days then <br />sample weekly for a month and evaluate effectiveness after each sample <br />result is received. <br />We plan to build a diagonal berm across the corner of the pond to <br />isolate <br />the impacted area and protect the main body of water, but have to wait <br />for <br />equipment to be decon'ed and available and for clean soil import - <br />probably <br />Thurs 3-1. We plan to isolate a triangular corner of about 50 to 75 <br />feet <br />along the two shorelines. <br />Please call <br />Sergius N. Hanson, PE, PG <br />E-21 Engineering, Inc. <br />2695 South Raritan Street <br />Englewood, Colorado 80110 <br />Off (303) 991-6000 <br />Fax (303) 991-6001 <br />Cell (303) 507-7484 <br />Serge ,e-21en ing eering com <br />6/9/2007