Laserfiche WebLink
Page 3 of 3 <br />than <br />previously estimated ( 7 to 8 feet in places) and based on field <br />observations and PID screening, Brian estimates we may need to remove <br />another 400 to 500 CY on the west side. We have 10 semi's running today <br />and <br />will probably finish the west side removal action tomorrow. <br />The Geocon - E-21 removal team has developed field work routines, <br />assignment <br />of duties, haul routes, and an efficient operations process. The <br />excavation, <br />screening, loading, and transport is now running smoothly in spite of <br />the <br />muddy conditions and extensive off-road hauling. <br />Please call my cell or e-mail your comments and possible concurrence/ <br />approval. <br />Serge <br />Sergius N. Hanson, PE, PG <br />E-21 Engineering, Inc. <br />2695 South Raritan Street <br />Englewood, Colorado 80110 <br />Off (303) 991-6000 <br />Fax (303) 991-6001 <br />Cell (303) 507-7484 <br />$erge@e-21engineering.com <br />6/9/2007