My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-20_REVISION - M1982015 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982015
>
2007-11-20_REVISION - M1982015 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:41 PM
Creation date
3/18/2009 4:24:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
REVISION
Doc Date
11/20/2007
Doc Name
Addendum 1 to Integrated Corrective Action Plan
From
E-21 Engineering, Inc.
To
DRMS
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.1 Soil Vapor Extraction Pilot Test Results <br />The SVE pilot testing was performed by attaching a reversible positive displacement <br />blower on the pilot test well head. A step test was performed with a vacuum that was <br />applied starting at 10" of Hg for 15 minutes and then increased to 15" of Hg. Selected <br />monitoring wells in the vicinity of the SVE pilot test well were monitored for vacuum. The <br />air flow and VOC generation was monitored from the effluent from the blower. The <br />results are included below. <br />SVF Taco Racii1fe of 14A11 of U'3A <br />Well ID Vacuum <br />(inches of water <br />column) Distance <br />(ft) Max PID <br />(ppm) Max Air Flow <br />(SCFM) <br />SVE-1 130 0 1,835 105 <br />MWA R 3.0 20 <br />MW-17 1.65 30 <br />MW-6R 1.65 50 <br />MW-2R 0.0 90 <br />SVF Taco Raculfc of IRA" of Uon <br />Well ID Vacuum <br />(inches of water <br />column) Distance <br />(ft) Max PID <br />(ppm) Max Air Flow <br />(SCFM) <br />SVE-1 180 0 1,404 124 <br />MW-1R 4.6 20 <br />MW-17 3.1 30 <br />MW-6R 3.0 50 <br />MW-2R 0.0 90 <br />Based on the results of the test, a substantial soil vacuum may be generated up to 50 <br />feet from the pilot test well. Air flow (exceeding 100 SCFM) is optimal and relatively high <br />VOCs were generated during both steps of the test. The test was deemed successful <br />and the SVE pilot testing was stopped. <br />10
The URL can be used to link to this page
Your browser does not support the video tag.