My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_GENERAL DOCUMENTS - M1984101 (8)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984101
>
2009-01-13_GENERAL DOCUMENTS - M1984101 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:52 PM
Creation date
3/11/2009 9:11:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/13/2009
Doc Name
Referral Response- Add. B
From
Park County
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hard "Rock Paving &` edi Mix Inc. <br />P.O. Box 37 <br />Salida, Colorado 81201 <br />Phone 719-539-2222 <br />2/3/03 <br />Division Of Minerals & Geology <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br /> <br /> <br />RE: Technical Revision to NLRB Permit #M-84-01 Chaparral Meadows Pit, 66.8 acres <br />W l /2 of the NW, all of NE l /4 of Sec. 18, T 12 S, R74W, 6 PM, Hartsel, Park County, <br />Colorado. . <br />Hard Rock Paving & Redi Mix, Inc. proposes to mine phase #3 at this time rather <br />than phase #2. Hard Rock Paving & Redi Mix, Inc. will build an access road to phase #3. <br />The reasons for the technical revision to permit #M-84-01 are as follows; <br />1. The aggregate is of higher quality in phase #3 than it is in phase #I and <br />phase #2. The aggregate from phase #3 will be crushed aggregate to be <br />used in Hot Mix Asphalt for paving approximately 27 miles of Highway <br />25 during the 2003 construction season. <br />2. The phase #2 provides higher quality grazing area than does phase #3 <br />and should be utilized for grazing. Phase #1 has small stockpiles of <br />crushed material that will also be utilized on the above-mentioned <br />project.. These small stockpiles will be used for shoulder material for <br />this project. County road 59 will remain the primary access to phase <br />#3. <br />3. No irrigation ditches or other structures currently occur on site. County <br />Road 59 will remain the primary access to phase #3. <br />4. Phase #3 is also vacant land that is ideal for the requirements of this <br />state highway project. Prior to crushing, the top that covers the area <br />will be stripped and stockpiles for use in reclamation of the area. Hard <br />Rock Paving & Redi Mix, Inc. will mine-crush from the West boundary <br />to the East. <br />Equal Opportunity Employer
The URL can be used to link to this page
Your browser does not support the video tag.