i <br />ameclur <br />Earth & Environmental <br />LOB EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 Project No.: 8420125EO <br />Owner: Cripple Creek & Victor Gold Mining Co. Contractor: Ames Construction Co. Inc. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ LOB <br />Date: 2/27/09 Reporting Period: 02/23/09 through 02/27/09 <br />Days S M T W T F <br />Work Shifts D D D D D <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 15°to 28° High: 33°to 51° <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: no delays due to weather this week. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. LOB Pad <br />• The LOB Pad area was completed by the end of the week. Minor clean-up <br />work and removal remained to be completed around the mine working #19 <br />located on the North side of the pad approximately 125-150 feet left of <br />centerline at Station 31+70. Mine working #20 appears to have been <br />removed due to cut in the pad. . <br />2. LOB/Delivery Road <br />• The delivery road is basically complete of all clearing and grubbing. <br />B. Stripping <br />1. LOB Pad <br />• Stripping is complete. Minor cleanup to waste remains around the mine <br />workings # 19. <br />2. LOB/Delivery Road <br />• Stripping is complete. Minor cleanup to waste remained. <br />Sheet 1 of 9 LOB Weekly Report WE 02.27.09.13