Laserfiche WebLink
. <br />ame <br />Earth & Environmental <br />E. Subgrade Preparation <br />1. LOB Pad <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />1. LOB Pad <br />• No Activities <br />2. LOB/Delivery Road <br />• No Activities <br />G. Miscellaneous <br />1. Ames placed safety berms around Clay borrow <br />2. Ames places safety berms around laydown area <br />II. Underground Working <br />A. Drilling <br /> • No Activities <br />B. Mine Shaft/Stope Remediation <br /> • No Activities <br />C. Lateral/Slot Remediation <br /> • No Activities <br />III. Storm water Management Structures <br />A. LOB Stormwater Culverts <br /> • No Activities <br />B. Roadside ditch <br /> • No Activities <br />C. Best Management Practices (BMPs) <br /> • No Activities <br />IV. LOB Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />Sheet 2 of 5 LOB Weekly Report WE 1.17.09.doc