Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DRMS <br />Task #: 002 State :Colorado Permitrlob #:M-2007-036 <br />Date : 0811612007 County: Weld Abbreviation :none <br />User : ESC Site :Holton Lakes Filename :M036-002 <br />Permit or other job action :New 112C Permit <br />Task description :Backfill & Grade Slopes <br /> <br />HOURLY EQUIPMENT COST <br /> Shift basis : 1 per day <br /> jEquipment Description <br />Scraper work team -Scraper.lCat 637G w/push-pull <br />-Push dozer fNA <br />Cost Bn <br />Road maintenance -Motor grader: NA <br />-Water truck :NA <br />Support equipment -Load area: NA <br />-Dump area Cat D8R Series 11- 8SU (2005) <br />,akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA dozer NA NA <br />% Utilization-machine: 100 NA NA 100 NA NA <br />-Ripper attachment : NA NA NA 0 NA NA <br />Ownerhip cost/hour : $103.51 NA NA $51.18 NA NA <br />Operating cost/hour: $167.18 NA NA $73.75 NA NA <br />Ripper op. cost/hour : NA NA NA $0.00 NA NA <br />Operator cost/hour $32.96 NA NA $32.78 NA NA <br />Unit subtotals $303.66 NA NA $157.70 NA NA <br />Number of units : 4 0 0 1 0 0 <br />Group subtotals : Work : $1,214.62 Support : $157.70 Maintenance : $0.00 <br />Total work team cost/hour : $1,372.33 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 333,000 LCY factor : NA volume : 333,000 LCY <br />Source of quantity take-off :Operator Estimate _ <br />Source of estimated swell factor :NA