Laserfiche WebLink
STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-Scale 11"17, Floor, cons., 6'th.-Mesh rein/. 187.00 SF $3.7000 $691.90 <br />-Seale House and Ofice 20"36' Demoldisplappr. dump - to 5 mi. 7,200.00 CF $0.6443 S4,638.83 <br />-Employee and vkvlmparkirg 24"50' Pavement b9'um. - 3'1h. 1,200.00 SY S3.0200 $3,624.00 <br />-South Platte River Crossing Conveyor 3007.. Conveyor, elevaled - 8'W x 10' H 300.00 LF $44.2100 $13, 263.00 <br />-Ovedand Conveyor 22007.. Conveyor overland - 8' W x 1V H 2,200.00 LF 5221200 $48,664.00 <br />-Truck washout shudure 10"50"6'(4) Floor, cons., avg. reint - 12.1h. 2,000.00 SF $3.3442 $6,688.47 <br />.7ruoh wastmut stnrctum concrete stabs 4^4'•1•(2) Floor, cons., avg. re1n1. - 12'th. 3200 SF 53.3442 5107.02 <br />-Fueling stalion 15"30"4' Floor, conor., avg. reint - 12'th. 450.00 SF $3.3442 $1,504.91 <br />-Wheel wash 11"60"0.5' Flow, corr., avg. rain!. - 12'th. 660.00 SF $3.3442 S2207.19 <br />-Haul to LandM 13000 Load,2 mi. had, no slvg. -Mach. L. 1,000.00 CY $12.5100 $12,510.00 <br />-LandMi Mposal Fees 1000 CY Dump fees - Su" constr. mat. 1,000.00 CY $53.8100 $53,810.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> T <br /> _ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $147,709 Total Cost (adjusted for location): $136,365