My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-04_PERMIT FILE - M2008082 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008082
>
2009-03-04_PERMIT FILE - M2008082 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:06 PM
Creation date
3/5/2009 1:45:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
PERMIT FILE
Doc Date
3/4/2009
Doc Name
Adequacy Response
From
Hart Environmental
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />MALL-=RWIN <br />CONiTRuCTION DIVISION <br />To: Bill Timmons - General Manager <br />ReadyMixed Concrete Company dba as <br />Boral Aggregates <br />14585 Brighton Road <br />Brighton, CO 80601 <br />Phone: (303) 668-1751 <br />Fax: (303) 659-7353 <br />e-mail: bill.timmons(@boral.com <br />Hall-Irwin Corporation <br />301 Centennial Drive <br />Milliken, CO 80543 <br />Phone: (970) 587-7200 <br />Fax: (970) 352-6284 <br />Date: September 17, 2008 <br />Project: Holton-Morton Pit Slurry Walls <br />Revision #5 - Reservoirs 1-5 <br />Reference: Drawing Sheets 1 through 5 as prepared by <br />Hart Environmental dated 2/28/07 & <br />Aggregate Property Evaluation Report as prepared <br />by Construction Technical Services, Inc. dated 10/2103 <br />Also, Test Hole Location for Morton Property sheet 1 <br />dated 1/31/08, Draft Reclamation Map sheet 2 & <br />Extraction Plan Map sheet 3, both dated 1/12108. <br />Prepared by: Brad Weber <br />(970) 587-7258 <br />bweber0hall-irwin.com <br />BID PROPOSAL <br /> Holton-Morton Pit Slurry Walls <br /> Reservoir# 1 <br />ITEM DESCRIPTION QTY UNITS UNIT PRICE EXTENSION <br />500 Engineering & Quality Control <br />510 Survey & Layout 1 Is $ 2,525.00 $ 2,525.00 <br />520 Engineering & Quality Control 1 Is $ 84,735.00 $ 84,735.00 <br /> 500 Engineering & Quality Control 1 Is $ 87,260.00 $ 87,260.00 <br />1000 General Conditions <br />1030 Mobilization/Demobilization 11s $ 45,580.00 $ 45,580.00 <br />1000 General Conditions 244,296 sf $ 0.19 $ 45,580.00 <br />26W Slurry Trench Excavation & Backfill <br />2510 Slurry Trench Excavation & Backfill to 31' Deep 216,456 sf $ 2.05 $ 443,734.80 <br />2520 Key Excavation to 4' Deep 27,840 sf $ 6.33 $ 176,227.20 <br />2500 Slurry Trench Excavation & Backfill 244,296 sf $ 2.54 $ 619,962.00 <br />2700 Cap Construction <br />2710 C Construction 6,9601f $ 5.49 $ 38,210.40 <br />2700 Cap Construction 244,296 sf $ 0.16 $ 38,210.40 <br />2800 Backfill Over Cap <br />2820 Crossings Over Gap 2 ea $ 2,355.00 $ 4,710.00 <br />28W Backfill Over Cap Ills $ 4,710.00 <br />2900 Leak Test <br />2920 Leak Test for Reservoir# 1 1 Is $ 29,400.00 $ 29,400.00 <br />2900 Leak Test 1 Is $ 29,400.00 <br />Total for Reservoir# 1 244,296 sf $ 3.38 $ 8251122.40 <br />Reservoir# 2 <br />ITEM DESCRIPTION QTY UNITS UNIT PRICE EXTENSION <br />500 Engineering & Quality Control <br />510 Survey & Layout 1 Is $ 2,660.00 $ 2,660.00 <br />520 Engineering & Quality Control 1 Is $ 89,315.00 $ 89,315.00 <br /> 500 Engineering & Quality Control 1 Is $ 91,975.00 $ 91,975.00 <br />1000 General Conditions <br />1030 Mobilization/Demobilization 11s $ $ - <br /> 1000 General Conditions 257,499 sf $ - $ <br />Boral Aggregate Slurry Walls (don't use summary) - Reservoirs 1 - 5 Rev. 5 (9-18-08) <br />9/18/2008, 12:02 PM Page 1
The URL can be used to link to this page
Your browser does not support the video tag.