My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-02_GENERAL DOCUMENTS - M1977285
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977285
>
2009-03-02_GENERAL DOCUMENTS - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:58 PM
Creation date
3/5/2009 7:38:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
3/2/2009
Doc Name
Decision
From
BLM
To
Denison Mines (USA) Corporation
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The Operator would keep fuel Logs of refueling activities for all refueling activities. The <br />Operator would provide refueling contractors with fuel unloading procedures and guidelines. <br />5. The Operator would inspect and test buried oil-containing lines if they were exposed. If <br />piping is removed from service or in standby, the Operator would bank-flange and mark them at <br />terminal or transfer point. <br />6. The operator would inspect secondary containments after a rain event, including rain events <br />resulting in water released from diked area via pump. <br />7. The Operator would conduct visual inspections of aboveground pipes, valves, appurtenances, <br />bulk storage tanks, containments and portable oil storage on a monthly basis. <br />8. The operator would conduct bulk storage tank integrity testing every 10 years. <br />9. The Operator would maintain all records in the SPCC plan book at the mine site for at least 3 <br />years. <br />10. The operator would conduct annual training for individuals responsible for oil-handling. <br />Completion of training would be recorded and maintained within the SPCC plan book for 3 <br />years. <br />11. The Operator would place fuel tanks in plastic lined secondary containment area or <br />equivalent. <br />12. The Operator would store waste products of these chemicals, collected as a result of routine <br />vehicle and equipment maintenance, in steel drums in the maintenance shop, or within a plastic <br />and earthen lined bermed area. The drums would be picked up on a periodic basis by a <br />contractor. <br />Visual <br />Any new facilities would be painted a color as recommended by the BLM to blend in with the <br />environment. <br />Groundwater <br />1. Denison must provide monthly reports on the status of the characterization and geohydroiogic <br />studies, and fate and transport models to the BLM. <br />2. Denison will provide quarterly reports on monitoring date from all groundwater monitoring <br />wells. Water quality will be tested for any potential leachates that are identified in the <br />characterization tests. An annual summary report will be provided to the BLM.
The URL can be used to link to this page
Your browser does not support the video tag.