Laserfiche WebLink
Colowyo C-1981-019 <br /> 19 February 2009 <br /> Pg 414 <br /> Excess Spoil: - The current active dump area for the South Taylor Pit is the C-C' <br /> underdrain area of the East Taylor fill (although there was no active dumping at the <br /> time of the inspection). The fill has advanced to within a few hundred feet of the <br /> crusher bench. The piles of spoil that had been dumped in the bottom of the fill area <br /> have now been covered as the pile has advanced. <br /> - The Streeter fill was covered with some snow but appeared to be stable at the time <br /> of the inspection. No erosional features were noted on the fill. <br /> This completes the 19 February 2009 inspection report for the Colowyo Mine, <br />