Laserfiche WebLink
Topsoil <br />Additional <br />reclamation and <br />repair work has <br />been completed <br />since last <br />inspection. A small <br />area above Fill 7 <br />has been graded, <br />topsoiled, and <br />seeded. <br />Downdrains have <br />also been repaired <br />with some repairs <br />yet to be <br />completed. Good <br />weather conditions <br />have allowed for <br />equipment access <br />to steeper areas. <br />Sediment is being <br />cleaned from a <br />sediment trap <br />immediately <br />upstream of the <br />large culvert below <br />Fill 8 where a gas <br />line crosses the <br />drainage. This <br />material is being <br />hauled to a low <br />area on the main <br />disturbance where it <br />will be dried and <br />spread prior to <br />topsoiling and <br />reseeding. <br />NN" <br /> <br />Yy <br />Overall, the operator is making excellent progress on completing the remaining tasks in the <br />reclamation plan. All areas should be fully reclaimed this field season.