Laserfiche WebLink
Mr. Brice Romig <br /> October 29, 1997 Page 2 <br /> You are reminded that the Climax Molybdenum Company, as the owner of this facility, is <br /> liable for the safety of the structure and for any loss of life and/or damages caused by a failure of <br /> the dam or appurtenant structures. Acceptance of the construction does not relieve the owner <br /> from this liability or from any other statutory obligations. Therefore, it is in the owner's best <br /> interest to operate and maintain the facility in a manner such that the safety of the dam and the <br /> general public are not jeopardized. We are enclosing a copy of Rules 12 and 15 of the Rules and <br /> Regulations for your reference and use. These rules pertain to general maintenance items and the <br /> owner's responsibilities, respectively. <br /> If you have any questions concerning this matter or any dam safety related issues, please do <br /> not hesitate to contact either Mark Haynes in our Denver office at (303) 866-3581 Ext. 276 or <br /> John Blair in our Glenwood Springs office at (970) 945-5665. <br /> Sincerely, <br /> Jack G. Byers, P.E. <br /> Assistant State Engineer <br /> • Enclosure: Copy of Rules 12 and 15 of the "Rules and Regulations for Dam Safety and Dam <br /> Construction" <br /> xc: Orlyn Bell, Division Engineer (w/o Enclosure) <br /> John Blair, Dam Safety Field Engineer (w/o Enclosure) <br /> Bill McEwen, Water Commissioner(w/o Enclosure) <br /> Steven Maly, W.W. Wheeler and Associates, Inc., Design Consultant (w/Enclosure) <br /> JGB\MR1Vmh:370103-4.D0C <br />