My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-11-13_REVISION - M1977493 (50)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
1997-11-13_REVISION - M1977493 (50)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:07 PM
Creation date
3/3/2009 1:49:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
11/13/1997
Doc Name
Eagle Park reservoir- Final Reclamation Report and Analytical Summary
From
Climax Molyb
To
DMG
Type & Sequence
SR2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> OFFICE OF THE STATE ENGINEER of.Co <br /> Division of Water Resources <br /> 9 <br /> �Jepartment of Natural Resources o <br /> 1313 Sherman Street,Room 818 <br /> Denver,Colorado 80203 <br /> Phone(303)866-3581 <br /> FAX(303)866-3589 Rov Romer <br /> Governor <br /> James S.Lochhead <br /> Executive Director <br /> Hal D.Simpson <br /> State Engineer <br /> October 29, 1997 <br /> Mr. Brice Romig <br /> Climax Mine <br /> Highway 91 - Fremont Pass <br /> Climax, CO 80429 <br /> When replying, please refer to.- <br /> EAGLE PARK RESERVOER DAM <br /> AKA CLIMAX MOLY NO. 4 DAM <br /> Construction File Number: C-1106C <br /> Water Division 5, DAMIID: 370103 <br /> • SUBJECT: Acceptance of Construction <br /> Dear Mr. Romig: <br /> A final inspection of the seepwater pipeline construction project for the existing Eagle Park <br /> Reservoir Dam was performed by Mark Haynes of our office on August 26, 1997 to confirm that <br /> the construction of this project had been Substantially and satisfactory completed. Subsequent to <br /> the inspection, our office received a certification of compietion letter, "As-Constructed" drawings <br /> and other completion documents from your engineer in accordance with Rule 10 of the State of <br /> Colorado's "Rules and Regulations for Dam Safety and Dam Construction". Based on a review <br /> of the aforementioned documents and the results of the final construction inspection, the <br /> construction of the seepwater pipeline through the left abutment area of the existing Eagle park <br /> Reservoir Dam is considered to have been satisfactorily completed and generally constructed in <br /> accordance with the approved plans and specifications. Therefore, this construction project is <br /> accepted for full use and the dam and reservoir can be used for water storage, whenever water is <br /> legally and physically available. <br /> The completion of this project did not enlarge or decrease the size of the dam and reservoir. <br /> According to our records, Eagle Park Reservoir Dam has a maximum dam height of 13 5 feet and <br /> a dam crest length of approximately 1,840 feet. The reservoir storage capacity at the maximum <br /> normal water surface is estimated to be 3,148 acre-feet. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.