Laserfiche WebLink
ASPHALT <br />qZENIMEM11hL <br />SPECIALTIES CO. <br />10100 Dallas St. Henderson, CO 80640 (303) 289-8555 Fax: (303) 289-7707 <br />February 27, 2009 RECPlp <br />C. LUU- <br />Mr. Eric Scott, Reclamation Specialist MAR C? --b 1 <br />Division of Reclamation, Mining and Safety Division oa rcv,.;iarnation, <br />1313 Sherman St., Room 215 Mining and Safety <br />Denver, CO 80203 <br />RE: Submittal of Technical Revision No ,Z for Turnpike Mining Resource. Permit No. <br />M-2004- 009 <br />Dear Mr. Scott: <br />Enclosed is a short explanation of what this Technical Revision (TR) No. 2 is all about <br />and revised exhibits to the permit: Ex. C-2 Mine Plan (2 map sheets), Ex. D Mine Plan <br />text, Ex. E Reclamation Plan text, Ex. F Reclamation Plan (3 map sheets), Ex. L <br />Reclamation Costs and Ex. S Permanent Man-made Structures. No other changes at the <br />mine site have occurred that would warrant any other changes to the remaining Exhibits <br />from the original 2004 approval and the 2006 amendment approval. <br />Also enclosed is check number 9551 in the amount of $216.00 to cover the cost of <br />processing this TR submittal. <br />You are very aware of the need for this TR in order to clarify changes that have come <br />about in the last two years, encompassing primarily a change in the final reclamation <br />configuration of the northern part of the site. That constitutes the only real significant <br />change to this permit. We are also submitting information for the completion of a design <br />for the clay-liner to the future reservoir and ponds to reduce the bond cost for those <br />liners. <br />Thank you in advance for your timely review and approval of this application and pleas <br />contact me if you have questions or concerns. <br />Sincerely, <br />Rob Laird <br />Land Manager <br />cc: file