My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-26_GENERAL DOCUMENTS - M2000039
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2000039
>
2009-02-26_GENERAL DOCUMENTS - M2000039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:53 PM
Creation date
3/2/2009 4:01:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000039
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/26/2009
Doc Name
Cost summary form no bond increase
From
DRMS
To
McKenna Limestone Quarry
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT <br />Machine Total Fleet Size Haul Trip <br />Description Cost/hour/unit (No. units) Cost/hr/fleet <br />Return Trip <br />sheet 2 of 2 <br /> Subtotals : $0.00 $0.00 <br /> <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Walsenburg <br />Transportation Cycle Time : Non- Total one-way travel distance : 14.0 miles <br />Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.47 0.47 <br />Return time (hours) = 0.47 0.47 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 1.93 0.93 <br /> <br />JOB TIME AND COST <br />Total non-roadable mob/demob cost " : $1,422.06 <br />two round trips with haul rig <br />Total roadable mob/demob cost `" : $0.00 <br />one round trip, no haul rig <br />Total job time : 3.87 hours <br />Total job cost : $1,422 <br />
The URL can be used to link to this page
Your browser does not support the video tag.