Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 005 State : Colorado Permit/job #: M-2000-039 <br />Date : 02/26/2009 County : Huerfano Abbreviation :none <br />User:- KAP Site :Mc Kenna Limestone Quarry Filename :M039-005 <br />Permit or other job action : Bond Recalculation Related To Inspection <br />Task description :Mobilize/Demobilize <br />Truck tractor description :Generic on- <br />Truck trailer description : Generic folc <br />Available <br /> Total Unit Cost/hOL <br /> <br />NON-ROADABLE EQUIP MENT <br />Machine Weight/unit ' Ownership Haul Rig <br />Description (Tons) Cost/hr/unit Cost/hr/un <br />-rat r)QR - QR11 t2nn51 66.73 $62.35 $125.45 <br />Shift basis : 1 <br />Cost data source : C. <br />tractor. 6x4, diesel powered. 400 HP <br />$44.38 $46.13 <br />$27.66 $27.66 <br />$0.00 $25.39 <br />$88.67 $117.55 <br /> <br />Fleet Size Haul Trip <br />(No. units) Cost/hr/fleet <br />1 $187.80 <br />(2nd half, 2006) <br />50T, and 100T) <br />51 + Tons <br />$22.33 <br />$50.07 <br />$27.66 <br />Return Trip DOT permit <br />'ost/hr/fleet Cost/fleet <br />$125.45 $0.00 <br />-Revegetation Equipment 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br />-Light Duty Pickup. 44. 314 2.25 $3.31 $88.67 1 $91.98 $88.67 $0 00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $388.45 $302.79 $0.00