My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-26_GENERAL DOCUMENTS - M2000039
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2000039
>
2009-02-26_GENERAL DOCUMENTS - M2000039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:53 PM
Creation date
3/2/2009 4:01:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000039
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/26/2009
Doc Name
Cost summary form no bond increase
From
DRMS
To
McKenna Limestone Quarry
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 005 State : Colorado Permit/job #: M-2000-039 <br />Date : 02/26/2009 County : Huerfano Abbreviation :none <br />User:- KAP Site :Mc Kenna Limestone Quarry Filename :M039-005 <br />Permit or other job action : Bond Recalculation Related To Inspection <br />Task description :Mobilize/Demobilize <br />Truck tractor description :Generic on- <br />Truck trailer description : Generic folc <br />Available <br /> Total Unit Cost/hOL <br /> <br />NON-ROADABLE EQUIP MENT <br />Machine Weight/unit ' Ownership Haul Rig <br />Description (Tons) Cost/hr/unit Cost/hr/un <br />-rat r)QR - QR11 t2nn51 66.73 $62.35 $125.45 <br />Shift basis : 1 <br />Cost data source : C. <br />tractor. 6x4, diesel powered. 400 HP <br />$44.38 $46.13 <br />$27.66 $27.66 <br />$0.00 $25.39 <br />$88.67 $117.55 <br /> <br />Fleet Size Haul Trip <br />(No. units) Cost/hr/fleet <br />1 $187.80 <br />(2nd half, 2006) <br />50T, and 100T) <br />51 + Tons <br />$22.33 <br />$50.07 <br />$27.66 <br />Return Trip DOT permit <br />'ost/hr/fleet Cost/fleet <br />$125.45 $0.00 <br />-Revegetation Equipment 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br />-Light Duty Pickup. 44. 314 2.25 $3.31 $88.67 1 $91.98 $88.67 $0 00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $388.45 $302.79 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.