Laserfiche WebLink
Exhibit L - Reclamation Costs <br />area needed to reclaim if the site reaches the optimumal reclaimed area will be <br />27.08± acres (determined by subtracting the final basin area at the anticipated final <br />water level, or 105.44± acres, from the area of the extraction limits, or 132.52± <br />acres): <br />Summary of Reclamation Costs: <br />$ 33,212.71± Total Site Preparation Prior to Re-soiling. <br />$ 7,522.61± Total Re-soiling <br />$ 4,072.77± Total Re-vegetation <br />$ 44,808.09± Sub-Total <br />$ 4,000.00± Mobilization and Demobilization Costs (8 pieces of equipment) <br />$ 48,808.09± Sub-Total <br />$ 81834.27± RMS Indirect Costs @ 18.1 % of Total Reclamation Costs <br />$ 579642.36± Grand Total - Financial Warranty Amount <br />RECLAMATION EXPOSURE: <br />Based upon the Mining and Reclamation Plans of this application, the status and <br />trend of activities and affected land; and related calculations to estimate <br />reclamation liability, are determined as follows. <br />Please Note: Due to the difficulty of calculating heavy equipment costs similar to <br />the Division's software program, unit costs from previous and reasonably current <br />Division estimates of like or similar kind have been utilized to create a reasonably <br />close estimate. The per unit basis from Division records are shown along with <br />other sources used or referenced to determine unit costs, at the back of this exhibit. <br />DEWATERING: <br />Dewater 42.0±± Acres <br />.•. 21.0± acres to dewater <br />x 50± feet - depth <br />1050.0± Acre Feet of water <br />x 325,900.00± gallons of water per Acre Foot <br />342,195,000.0± gallons of water to dewater <br />Varra Companies, Inc. Heintzelman Project RMS 112 Permit Application 2 <br />2 February 2008