SENECA II-W MINE <br />2008 ANNUAL RECLAMATION REPORT <br />2008 DISTURBANCE AREA <br />Although no there were no additional acres disturbed during 2008, the Seneca II-W Mine area was reviewed <br />and revised (based on physical surveys and aerial photography) to accurately portray the categories of <br />activities: the final disturbance boundary has been updated to match the aerial photography; potential <br />permanent roads and ponds delineated, etc. The total disturbance is 1,381.9 acres. This acreage is reflected <br />on the CDRMS Annual Report Form and is discussed in the text of the following report. The attached 2008 <br />Reclamation maps portray the physical disturbance boundaries but do not include or show the 96.6 acres <br />associated with the Tie-Across Haul Road. <br />BACKFILLING AND GRADING <br />There were a total of 6.1 acres backfilled and graded in 2008. These areas are shown on the attached 2008 <br />Graded Areas map. <br />TOPSOIL AND SPOIL MONITORING <br />SCC is required by Permit C-82-057 to monitor the salvage, storage, and redistribution of topsoil and spoil <br />handling operations at the Seneca II-W Mine. Only 6.1 acres of backfilling/grading (topsoil stockpiles) and <br />0.9 acres of topsoil replacement were conducted during 2008, therefore no monitoring was conducted. <br />• • Topsoil Recovery Documentation <br />There was no additional topsoil recovered during 2008. <br />• 2008 Topsoil Replacement Thickness <br />There was 0.9 acres of topsoil replaced; therefore no topsoil thickness samples were collected in 2008. <br />• Soil Pit -Topsoil Fertility/ Spoil Suitability <br />No topsoil fertility or spoil suitability samples were collected in 2008. <br />• Topsoil Balance <br />SCC submitted a topsoil balance with permit Revision 04 (dated 9/04). The topsoil balance has not been <br />revised since Seneca II-W is reclaimed except for roads and facilities areas. <br />Topsoil Salvage and Storage. No topsoil was salvaged during 2008. The life-of-mine disturbance from <br />which topsoil was salvaged (1,381.9 acres) and the topsoil stockpile sites as of December 31, 2008 are shown <br />the 2008 Topsoil Replacement map. <br />The remaining stockpile volumes as of December 31, 2008 are listed in Table 08.1, Topsoil Stockpile <br />Volumes. As of the end of 2008, 75.5 acre-feet of topsoil remain stockpiled in the mining area and 73.1 acre- <br />feet of topsoil are stockpiled along the Tie-Across Haul Road. <br />• Topsoil Replacement. Topsoil was replaced on 0.9 acres of disturbed area during 2008. Therefore, the <br />total remaining mine disturbance area requiring topsoil (as of December 31, 2008) is 84.1 acres.