DRMS notes that a radiological survey was completed of the proposed permit area. The survey provides good <br />data for some of the sites that will be mined and under exploration. The Division however is requesting a <br />focused survey on the area where the office and ore bins will be constructed. This will provide a baseline and <br />average for the area which can be used as a reclamation bench mark for this area. The grid should be a <br />maximum 25 foot by 25 foot spacing and cover the entire area where ore will be handled, stored and loaded for <br />shipping. Once the statistical average is obtained it should be noted in the reclamation plan for the area. The <br />plan should be changed to reflect what measures may be necessary to obtain the average such as a cap of <br />materials, removal and disposal or other methods the applicant may feel will be affective. <br />Section 2: Please provide a map specifically of the ore bin/ office area that is equivalent to Map T-1. <br />Section 12: Please revise to state that once the five (5) quarters of monitoring have been completed Nuvemco <br />will consult with DRMS on modifications to the sampling plan which may include a reduction in intervals or <br />termination of the monitoring. <br />Section 15: Please clarify that Nuvemco understands that DRMS staff reserves the right to do its own QA/QC. <br />Nuvemco must notify DRMS staff 5 working days prior to the beginning of construction of the ore bin so a pre- <br />pour inspection can be scheduled. Regardless of a DRMS inspection a post construction and as-built report <br />shall be submitted for Division review within 30 days of completion of the project. <br />Section 18: Please specify which piles and open adits will be closed. <br />Rule 6.5 Geotechnical Stability: <br />The exhibit appears to be sufficient. However, it will be reviewed by staff engineer when other details are <br />presented for review. <br />Rule 8 Emergency Response Plan: <br />DBMS should be included in Phase 1, Part b) ii) for contact within 24 hours. <br />Under Section C, Phase 3, Remediation: a) it should be noted that any remediation plan shall be submitted as a <br />Technical Revision to the Division for review and approval. It is understood that emergency measures must <br />always dictate the protection of human life, health and the environment first. Thus once the situation is stable <br />the regulatory aspects can be addressed. <br />Additional DRMS Staff review: <br />1) The rock geochemistry testing that is written into the EPP should include not only the initial, pre-mining <br />round, but also periodic testing through the life of mine to assess changes in the waste rock and ore <br />geochemistry with depth.