My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_GENERAL DOCUMENTS - M1984101 (2)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984101
>
2009-01-13_GENERAL DOCUMENTS - M1984101 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:52 PM
Creation date
2/26/2009 2:52:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984101
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/13/2009
Doc Name
Referral Response- Additional 1
From
Park County
To
DRMS
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 1,600 pounds/LCY Struck volume : 21.00 LCY <br />Material description - Heaped volume : 31.00 LCY <br />Top Soil Average volume : 26.00 LCY <br />Rated payload : 75,000 pounds Adjusted capacity: 26.00 LCY <br />Payload capacity: 46.88 LCY hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 8,740 <br /> Scraper Push dozer Source <br />Scraper loading time 1.80 minutes Altitude adj.: 0.980 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />' load time per scraper pair on push-pull models Net correction : 0.813 NA <br />Travel time : <br />Road condition description : Rutted dirt little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 500 -2.00 5.00 3.00 2800 0.39 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.39 minutes <br />" travel time for each segment is adjusted for acceleration/deceleration. Retum time : <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 496.77 LCY/hour **` Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />.Adjusted multiple scraper team (fleet) hourly production <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time <br />Unit cost : $0.619 /LCY Total job cost <br />0.35 <br />0.35 <br />minutes <br />3.14 minutes <br />404.07 LCY/hour <br />1 scraper(s) <br />404.07 LCY/hour <br />404.07 LCY/hour <br />132.03 Hours <br />$33,026