Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task #: 002 State : Colorado Permit/job #: M-1984-101 <br />Date : 0211912003 County : Park Abbreviation : none <br />User : JD1 Site : Chaparral Meadows Pit Filename : M101-002 <br />Permit or other job action : Final Reclamation <br />Task description : replace topsoil <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper : Cat 637G <br />-Push dozer : NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader :INA <br />-Water truck: INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />%Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $75.69 NA NA NA NA NA <br />Operating cost/hour : $149.02 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $25.43 NA NA NA NA NA <br />Unit subtotals : $250.14 NA NA NA NA NA <br />y <br />Number of units : 1 0 0 0 0 0 <br />Group subtotals.: Work : $250.14 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $250.14 <br />MATERIAL QUANTTTIES <br />Initial Swell <br />volume: 53,350 LCY factor <br />Source of quantity take-off : calculation <br />Source of estimated swell factor : NA <br />NA <br />Loose <br />volume : 53,350 LCY <br />t