Laserfiche WebLink
III. COMMENTS- COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during <br /> the inspection. Comments also describe any enforcement actions taken during the inspection and the <br /> facts or evidence supporting the enforcement action <br /> TCC continues to prepare a revision for expansion of the RDA to the east of the existing pile. <br /> Air Resource protection Due to snowy and thawing conditions dust control was not a concern. Visual air <br /> quality looked very good between snow squalls. <br /> Records: During recent permitting actions it has been recognized by both TCC and DRMS that our <br /> paper copies of the PAP were not 100% in agreement. The inspector compared TCC's Volume 1 of the <br /> PAP with the Division's copy. Inconsistencies were tabbed. The current RN5 permitting action will <br /> resolve these discrepancies. <br /> 4 of 5 WHITE-File YELLOW -Operator PINK-Specialist <br />