7-- _/ 5 r 49 q <br />EXHIBIT D- RECLAMATION PLAN <br />Soil will be replaced to a minimum of 6" in depth as the quarry areas are depleted or no <br />longer used. It will be seeded when it is known that no machinery will be driving on <br />those areas to be reclaimed. <br />2. The gradient of reclaimed slopes will be 3:1 or less. If steeper slopes are required then the <br />slopes will be stepped into terraces to accomplish the desired stability for the vegetation. <br />The slopes are expected to follow the general slope of the existing lands. <br />3. All salvageable soil will be kept and incorporated into to work deck or used to replace <br />deplete quarry areas for reclamation purposes or put into soil stock pile as shown on map. <br />Soil Stock Pile, if left for more than a 3 month period, will be stabilized with a vegetation <br />cover. <br />4. The following measures will be taken to re-vegetate the site as they are applicable. <br />(a) The thickness of the plant growth should be equal to or better than the surrounding <br />growth to establish the quantity and quality desired. ( See Exhibit B Custom Soils <br />report for Larimer County Area, Colorado Meadow Hollow Quarry) <br />(b) The site will be seeded on an on-going reclamation program. Top soil will be <br />replaced and seeded as it is determined that an area is depleted and it will not be <br />disturbed by machinery. Seeding will be done in the spring and late fall. Top soil will <br />be spread onto the reclamation site; top soil will be spread carefully to allow oxygen <br />in and to prevent compaction. <br />(c) See Soil resource report in Exhibit B for types and amount of PLS/acre. <br />(d) The seed will be applied by hand broadcast. <br />(e) Trees will be replaced at 48 seedling per acre. <br />5. Trees will be place randomly or in a natural pattern over the reclamation area at the rate <br />of 48 seedling per acre. The trees will be planted by hand and watered for until they <br />become established. <br />6. There are no ponds, streams, or buildings in the permit area. <br />7. The existing roads will remain as they provide access to the land surrounding the permit <br />area and were constructed for that purpose. <br />8. The quarry access roads will remain in place at the time of reclamation. <br />9. The waste rock and tailings will be incorporated into the reclamation areas of the <br />depleted quarries. They also may be sold as rip rap, or used for working decks for future <br />building site. The area will be seeded into pasture until the building site would be needed. <br />10. There should be no hydrologic disturbance or off site water damage as the work deck is <br />porous and absorbs all run-off. <br />& lctado