Laserfiche WebLink
..... <br />Onenerai G Gn1 nOM1=MT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $44.99 1 $44.99 $44.99 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $44.99 $44.99 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Trinidad <br />Transportation Cycle Time : Non- Total one-way travel distance : 23.0 miles <br /> Roadable Roadable Average travel speed : 55.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.42 0.42 Total non-roadable mob/demob cost $4,796,60 <br />Return time (hours) = 0.42 0.42 * two round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost "" : $37.63 <br />Unloading time (hours) = 0.50 NA ** one round trip, no haul rig <br />Subtotals = 2.34 0.84 <br /> <br /> <br />.............................................................. <br />......................................... <br />JOB TIME AND COST <br />.......................... <br />.......................... <br />.............................. <br />................................. .............................................................................................. <br /> <br />Total job time : .......... :::.::....... <br /> <br />4.67 hours <br /> Total job cost : $4,834