My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-18_PERMIT FILE - M2008076
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008076
>
2009-02-18_PERMIT FILE - M2008076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:42 PM
Creation date
2/19/2009 3:49:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008076
IBM Index Class Name
PERMIT FILE
Doc Date
2/18/2009
Doc Name
Second Adequacy Review & Cost Estimate
From
DRMS
To
LJ Development, Inc.
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Task #: 006 State : Colorado Permit/job #: M-2008-076 <br />Date : 0211812009 County : Las Animas Abbreviation :none <br />User : JLE Site : Robinson Sons Gravel Pit No. Filename : M76 -006 <br />Permit or other job action :Reclamation Cost <br />Task description :Mobilization and Demobilization of <br />sheet 1 of 2 <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $50.32 $125.45 1 $175.77 $125.45 $250.00 <br />-Cat 627G 40.90 $55.31 $117.55 2 $345.73 $235.10 $500.00 <br />-CAT 12H 14.41 $20.87 $88.67 1 $109.54 $88.67 $250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $631.04 $449.22 $1,000.00
The URL can be used to link to this page
Your browser does not support the video tag.