Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date `. 13-Feb-2009 Permit or job no. M-1993-050 Site : Dellacroce <br />User : 8MK Abbreviation : none State ; Colorado <br /> Filename : M050-000 - County ;El Paso <br />Agency'ororganization, name: DRMS <br /> Permit or job action : SURETY INCRESAE AFTER INSPECTION <br />------------ - --- -- -- <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK I DIRECT <br />NO. TASK DESCRIPTION USED' ! SIZE` HOURS COST <br />001 j -CUT•SIDE,SL.OPES TO 3:1 dozer 1 28:0 $4,761 <br />002 APPLY 6 INCHES OF TOPSOIL T <br />- <br />!^ dozer <br />T I 167.0 $7,907 <br />003 -REV <br />EGE 27ACRES _ <br />_ reuege.. 1 _56,0 $16,373 <br />004 1 , <br />-MOBIDEM06 mobilize 2 13.0 $1,275 <br /> <br />I I.. <br />I ? <br />.includes inflation SUBTOTALS 11 264.0 $30,316 <br />factor adjustment of : NA % TOTAL DIRECT COST' LL $30,316 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = ' $612 <br />Performance bond : 1.05 % of direct total _ $3.1 <br />8 <br /> <br />Job superintendent : <br />total . <br />_ <br />Profit : -? 10.00 of direct total = $3,032 <br /> TOTAL O &; P = $3,962 <br />LEGAL. ENGINEERING.- PROJECT MANAGEMENT - CONTRACT AMO UNT (direct+ O & P.) $34;278 <br />Financial warranty, processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid'preparation : 4.25 ofcntr: NA total $1,457 <br />-Reclamation management and/or administration : 5-o0 % of cntr. NA total = $1,714 <br />CONTINGENCY,-. NA' NA total- NA <br />" contingencies accounted.forat task level TOTAL INDIRECT COST= $7633 <br />- TOTAL BO ND AMOUNT .(direct +:indirect). _ $37,949