My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-13_INSPECTION - M1993050
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1993050
>
2009-02-13_INSPECTION - M1993050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:38 PM
Creation date
2/16/2009 2:37:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993050
IBM Index Class Name
INSPECTION
Doc Date
2/13/2009
Doc Name
FW Increase after a Site Visit
From
DRMS
To
Pioneer Sand
Inspection Date
12/29/2008
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />February 13, 2009 <br />Mr. Mike Ausburn <br />Vice President,:Pioneer Sand <br />P.O.Box 7650 <br />Colorado Springs, CO 80903 <br />Re: Financial Warrantee Increase, after a site visit on 12/29/08; M-1993-050 <br />COLORADO <br />D I V I S ION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Dear Mr. Ausburn; <br />The division. inspected the site on 12/29/08. At that time the Division had requested the operator (Pioneer <br />Sand) to provide a detailed survey of the total affected acres. The Division received the requested <br />information, on January 31, 2009: 'Based on the information you provided the attached warranty calculation <br />was completed. <br />The current warranty for the site is $25,200.00. The Division was unable to find the warranty calculation <br />that determined the amount at that time and the number of acres that was utilized to come up with the . <br />figure. This calculation was based on the information that was provided on 1/31/09. The maps provided <br />had a total of 24.84 acres affected with 16.17 acres reclaimed. Since the reclaimed sites:have not been <br />released, DRMS, recalculated the re-vegetation cost for the entire 24.84 acres. The earth moving was <br />calculated for a total of 9.0 acres. The calculated warranty for the current disturbed area is $37,949.00. Please <br />provide a rider to the current warranty in the amount of $12,749, no later than April 13, 2009. <br />The total affected acres for the active mining portion should not exceed. 9.0 acres at any given time. DRMS <br />recommends, Pioneer Sand, look at their phased mining plan to see if it can be adjusted to a manageable <br />number rather than the current 12 phases as approved when the site was amended to expand the area to be <br />mined from 11.2 acres to 64.8 acres.. <br />If you have questions, please contact me at (303) 866-3567 xt 8129 <br />Sincerely, <br />Berhan Keffelew <br />Environmental protection Specailist <br />Enclosures: Financial warranty calculation <br />Cc: Elizabeth Talaferro <br />- <br />..Office of' officeof <br />.
The URL can be used to link to this page
Your browser does not support the video tag.