Laserfiche WebLink
c.) The 10 acres used as the number that will be scarified are explained in the <br />item above. This is an estimated number based upon field experience in <br />other similar gravel pits. <br />d.) The average distance from the topsoil and overburden stockpiles to the <br />placement areas are as follows one-way distance to the further most points are: <br />565 feet <br />663 feet <br />490 feet <br />400 feet. <br />250 feet <br />540 feet <br />190 feet <br />315 feet <br />230 feet <br />190 feet <br />275 feet <br />4108 feet 111 = 374 feet 12 =187 feet average distance of haul <br />187 feet average distance of haul to spread the overburden and topsoil. <br />The average grade will be approximately 8.30%. <br />e.) No structures or permanent facilities will be constructed on the site for mining <br />and processing of materials, such as shops, conveyor systems, trailers, plants, etc. all of <br />the processing facilities will be mobile and will not require any permanent type <br />foundation such as concrete or other material that would have to be demolished and <br />remove off site after mining is completed. Everything used on site will be removed <br />without having to be demolished. All of the components will be dismantled, moved and <br />hauled off site to be used at other locations, everything is portable. The process <br />equipment is shown on Exhibit "C" Mining Plan Map. <br />6.4.16 EXHIBIT P-MUNICIPALITIES WITHIN TWO MILES <br />1.) The Town of Weston, Colorado is not an Incorporated City or Metropolitan <br />District. This town is under the governance of the Las Animas County <br />Commissioners. Please see the information attached for the description of the <br />area.