Laserfiche WebLink
III. COMMENTS.-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> installed along both banks of the creek (Figure 5) in order to provide sediment control for the <br /> reclaimed surfaces above. The slit fence should be monitored closely and maintained as <br /> necessary during the 2009 spring runoff to ensure that there are no negative impacts to water <br /> quality. <br /> Support Facilities <br /> • The upper and middle levels at the Paonia Loadout continue to be used for material <br /> storage. The substation was fenced and locked. A cluster of empty steel drums, initially <br /> observed during the Dec-08 inspection, continues to be stockpiled near the far northern end <br /> of the loadout, adjacent to the railroad tracks (Figure 6). <br /> Topsoil <br /> • The topsoil pile at the Paonia Loadout (southern end) is well covered with vegetation. <br /> This concludes the January 2009 inspection report for the Bowie No. 1 Mine. <br /> Bowie No. 1 Mine C-1981-038 29-Jan-2008 <br /> -2- <br />